Skip to content

Roof replacement

A new roof when the old one has had its day.

Full roof replacement with a written specification. The tiles are the last five per cent of the job.

Most roofs do not fail suddenly. They fail because a small fault sat unnoticed for a few winters, then a second one appeared, and then a third. At some point targeted repair stops being the right answer.

We will tell you honestly when that point has arrived, and show you why before you commit to anything.

Roof Replacement by Enniskerry Roofing

What you're seeing

Common signs, and what they usually mean.

Common roof symptoms and their likely causes
What you seeWhat it usually is
Repeat failures in different parts of the roofThe underlying structure has reached the end of its life
Slates or tiles becoming brittle and flakingMaterial degradation, often no longer made
Soft battens or perished underlay found at surveySub-structure failure under the visible finish
Sagging ridgeline or uneven roof planeStructural movement in the rafters or purlins

What's included

Everything in the job, written down.

No vague scopes. Here's exactly what you get before we ask you to agree to anything.
  • Full strip and condition survey of the existing structure
  • Written specification of deck, underlay, battens and fixings
  • Removal and lawful disposal of all existing materials
  • Natural slate, clay or concrete tile to your choice
  • Ridge, verge, valley and abutment detailing
  • Lead flashings dressed to code
  • Ventilation and insulation upgraded where required
  • Photographic record and written guarantee

How we work

Clear stages. No surprises.

  1. 01

    Survey

    We strip back a small area to see exactly what is under the existing roof before we price the work.

  2. 02

    Specification and estimate

    A written spec and an itemised estimate, so you know the materials and the guarantees before anything is agreed.

  3. 03

    Build

    Scaffold up, protection down, our own team on site. We only strip as much as we can make dry the same day.

  4. 04

    Handover

    Final inspection, photographs, guarantee paperwork and aftercare guidance before the final invoice.

Questions answered

Questions about this service.

Three signs it's likely replacement: you're seeing repeat failures in different parts of the roof; the slates or tiles are brittle, flaking or no longer made; or the battens are soft and the underlay has perished. One bad flashing or a handful of slipped slates is a repair. We'll show you which you're looking at.

It depends on three things: the size and pitch of the roof, the material you choose, and how much of the existing structure has to come off first. A straightforward tile swap over a sound deck is a very different job from a full re-roof where the battens and underlay have failed. We won't put a number on your roof until we've stood on it. You'll get a detailed, itemised written estimate after the survey, and the number you sign is the number you pay.

Most domestic re-roofs take between five and twelve working days from scaffold to handover, weather permitting. Larger, steeper or more complex roofs with multiple valleys, dormers and chimneys take longer. We agree the programme before we start and tell you immediately if the weather changes it.

Yes. We only strip as much as we can make dry the same day. If bad weather is forecast we don't start the strip, or we stage it and sheet over. Protecting the interior is the first job, not an afterthought.

Only if we find something genuinely hidden, rotten timber, a previous bodge, structural issues under the deck. If that happens we stop, show you photographs, and agree any change in writing before continuing. No surprise invoices.

Related services

You might also need.

  • Roof Repairs

    01

    Roof Repairs

    Slipped slates, damaged tiles, flashing failures and storm damage, diagnosed properly before we quote to fix them.

  • New Roof Installation

    02

    New Roof Installation

    Complete new roof installation for homes, extensions and new builds across Wicklow and South Dublin.

  • Flat Roofing

    03

    Flat Roofing

    GRP fibreglass and EPDM rubber systems for extensions, garages and outbuildings, specified for the fall, not just the finish.

Free estimate

Get a free roof replacement estimate.

Survey first, quote second. Tell us about the job and we'll come and look at it properly.
How urgent is it?

No obligation. We never pass your details to anyone else. Typically we call back the same working day.

Free estimate

A dry house starts here.

Talk to us about your next repair, replacement or survey.

Call +353 87 179 6843
Call now